Panel Tank Assembly

A 400KL tank assembly and ready to use in under 2 days

400KL Effluent tank assembled and ready to use in under 2 days

400KL Effluent tank assembled and ready to use in under 2 days

assembley1

The kliptank delivered as a flat pack to site

assembley2

A level sand base is prepared for the tank

assembley3

The base plates are positioned ready for the wall panels

assembley4

The panel segments are stood up in position around the base plate

assembley5

Lunch time

assembley6

The liner is spread over the base and up the sides

400KL Effluent tank assembled and ready to use in under 2 days

400KL Effluent tank assembled and ready to use in under 2 days